Official launch in Haiti of the rehabilitation works on the RD205 - HaitiLibre.com : Haiti news 7/7
 Download the revised decree and electoral calendar, published in the official journal





PNH Jacmel : Cleanup Day and Visit to the Firefighters

Environment : Agreement for a historic ecological transition in Haiti

FAd’H Recruitment : Strong mobilization of candidates in all departments

Surgical caravan : A 16-year-old girl gives birth to twins

FAd’H:l : Evaluation visit of the Minister of Defense to the Engineering Corps


more news


Zapping Haiti of June 9, 2026

The UN Secretary-General is expected in Haiti

ZED Airlines : Flights from Cap-Haitien to Montreal and back cancelled

Preparation for Brazil 2027 : Victory for Grenadières [3-1] against Equatorial Guinea (video)

Zapping Haiti of June 8, 2026


more news


Official launch in Haiti of the rehabilitation works on the RD205
18/05/2026 09:52:56

Official launch in Haiti of the rehabilitation works on the RD205

On Saturday, May 16, 2026, Joseph Almathe Pierre Louis, the Minister of Public Works, officially launched the rehabilitation work on the section of departmental road RD205 linking the city of Les Cayes to the commune of Torbeck, in the presence of the Minister of Tourism, the Minister of Agriculture, and local authorities from Les Cayes and Torbeck.

This long-awaited event marks a decisive step in the modernization of road infrastructure and the improvement of urban mobility in the Greater South. RD205 is a major strategic corridor that connects numerous towns, including : Les Cayes, Torbeck, Chantal, Arniquet, Saint-Jean-du-Sud, Port-Salut, Coteaux, Chardonnières, Roche-à-Bateau, Port-à-Piment, Les Anglais, and Les Irois.

Faced with the advanced state of disrepair of the existing road, which generates suffocating dust and causes daily disruption for road users, transporters, and agricultural producers, government intervention was urgently needed to open up the region. In line with this same focus on connectivity, the Ministry announced that the rehabilitation of the RD205 road as far as Port-Salut is already under study.

Funded with support from the World Bank, the project was specifically designed to overcome the hydrogeological constraints of this wetland. The technical teams opted for the construction of a hydraulic concrete roadway, a durable and resilient solution given the area's climatic conditions. The modern infrastructure will include two 3.5-meter-wide lanes, shoulders ranging from 1 to 1.5 meters in width, and a longitudinal drainage system reinforced by hydraulic crossing structures to optimize water runoff.

The work will begin this week and is expected to last ten months. Aware of the temporary disruptions this construction will cause, the Ministry requests the public's understanding and the support of the Haitian National Police (PNH) to secure the site and facilitate traffic management.

HL/ HaitiLibre



Twitter Facebook Rss
Send news to... Daily news...




Why HaitiLibre ? | Contact us | Français
Copyright © 2010 - 2026
Haitilibre.com